Construction Level 1 and 2
Reports to: Crew leader
Minimum Standards
Work Independently Fertilizer Application
Basic First Aid Snail Bait Application
Safety- use proper safety gear Blower
Soil Cultivation by Hand Chainsaw Operation
Hand Trenching Rototiller Operation
Planting Annual Color Thatcher
Planting Shrubs & Trees Verticutter
Tree Staking Aeration
Plant of the Week / Plan ID Hand Watering
Vine Tying Manual Irrigation Operation
Seeding & Lawn Renovations Glue Laterals
Lay Sod Drip Emitter Installation
Spread Bark Drip lateral installation
2” x 4” Header Board/Bender Board Head Installation w/ triple swing joints
Spread Cobble w/ Filter Fabric Head Adjustment
Field Stone Placement Time Reporting- Review & Sign timecard
Learn more about this Employer on their Career Site
