Job DetailsJob Location: Platte - Bldg B - Platte City, MO 64079Job Shift: First ShiftPosition Title: Planner - Fabrication Reporting to: Production Manager Department: Production  Central Power Systems & Services is a privately held company with deep roots going back to 1954.    Our Mission Statement is forging long-lasting partnerships by providing first-class customer support.  We live that statement every single day. We are looking for a Production Planner to help support that mission.   JOB SUMMARY                                                                            This planning position is focused on our Generator Manufacturing Division. Production planners, also known as production schedulers, are responsible for the smooth running of production within the manufacturing industry. They ensure that products are produced in a cost-effective way that meets quality and customer specifications, and that they are ready to distribute in a timely fashion. Production planners use Enterprise Resource Planning (ERP), a software system that manages a company's operations, to improve efficiency and productivity. They use it to interpret demand, assess material availability, and redesign processes.  RESPONSIBILITIES Ordering materials Monitoring scheduling timelines Managing employees Analyzing production delays Managing material and equipment availability Scheduling production Monitoring the production process for problems Planning and organizing production workflow for one or more products Reviewing and prioritizing operations to ensure maximum performance and minimum delay Organizing the distribution of goods and materials  Benefits Competitive Pay Medical, Dental, Vision & Life Insurance 401k with company match Paid Time Off  Training & Professional Development Positive and productive work environment  QUALIFICATIONS High school diploma or equivalent required, Degree in supply chain management, business management or related field is preferred Certification in Production and Inventory Management (CPIM) accreditation or other relevant certification is advantageous 1- 3 years proven experience working as a production planner in a continuous flow operation Proficiency in all Microsoft Office applications Sound knowledge of material requirements planning (MRP) and related software Strong analytical and problem-solving skills Excellent organizational and time management skills Effective communication skills Work Conditions Physical Demands / Work Environment This position regularly requires walking, standing, sitting, stooping, bending, kneeling, reaching, and climbing stairs throughout the workday. The role frequently requires pushing, pulling, twisting, and lifting materials weighing up to 50 pounds or more. Work is performed in both manufacturing and outdoor environments and may involve exposure to varying weather conditions, temperature extremes, dust, noise, moving equipment, and other industrial conditions. Appropriate personal protective equipment (PPE) must be worn as required. This description is intended to provide a general overview of the position and is not intended to be an all-inclusive list of duties, responsibilities, or physical requirements. Additional duties may be assigned as business needs require. Equal Employment Opportunity All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability, or status as a protected veteran. Central Power Systems & Services is a smoke-free and drug-free workplace. Employment offers are contingent upon the successful completion of a background check and drug screen (including THC). Candidates must be legally authorized to work in the United States. Employment eligibility will be verified at the time of hire. You must be legally authorized to work in the U.S. to be considered for this role. Â
Learn more about this Employer on their Career Site
